F&S will be conducting a PARTIAL ELECTRICAL OUTAGE affecting all three buildings in CLSL on Monday, March 22nd from 6:00AM to 10:00AM. This outage is needed to repair three main switches/breakers. While this is listed as an electrical outage, the electricity will only be affected in buildings B and C. The only effect that will be seen in building A is that the water pressure for the lab and domestic water supplies as well as the condenser water for the cold rooms will be down. This is due to the equipment that regulates the water supplies being located in building B. Further details about this outage are listed below:
Approved Outage Details:
Outage Request Number: 48310
Outage Time : 2021/03/22 06:00 until 2021/03/22 10:00
Outage Type : PARTIAL ELECTRICAL
Building : 0070 - CHEMICAL & LIFE SCIENCES LABORATORY
Building Sections affected : Building A
Building Services affected : Domestic and Lab water pressure and Condenser water for the environmental rooms will be down.
Building Occupants Effect : Domestic water or Lab water pressure Low
Comments : High Voltage Maintenance will be doing this work, and Shop 03 will be exercising the MCC disconnect switches while they are de-energized.
Shutoff Location : NOT APPLICABLE
Reason : Too Repair the 3 main switches/breakers for Mcc1, Mcc2, and Mcc3.
If you have any further questions or concerns, please do not hesitate to email the SCS Facilities and Safety team at scs-facilities@mx.uillinois.edu. This information will also be available for viewing on the SCS Building Outages/Important Notices blog: www.scsbuildingoutages.blogspot.com.
Safety/Environmental Compliance Specialist– School of Chemical Sciences
94 Roger Adams Lab
217-300-6618
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.