TO ALL IN CLSL-A:
F&S is conducting a LOW PRESSURE STEAM OUTAGE affecting CLSL on Saturday, August 19th from 6:00AM to 4:00PM. This outage is needed to repair a leaking control valve gasket. During the outage, the building will not have domestic or lab hot water. This will also affect any heating equipment connected to the low pressure steam. Further details about the outage are listed below:
Outage Time : 2023/08/19 06:00 until 2023/08/19 16:00
Outage Type : LOW PRESSURE STEAM
Building : 0070 - CHEMICAL & LIFE SCIENCES LABORATORY
Building Sections affected : entire building A & B/C
Building Services affected : hot water reheat system, domestic hot water, lab hot water
Building Occupants Effect : loss of all heating equipment fed from low pressure steam
Comments : null
Work order # : 11022809 BASEMENT MECH C SIDE. NEED AN ENERGY SERVICES WORK ORDER FOR SHOP 41 TO REPAIR LEAKING CONTROL VALVE GASKET. REF. WORK ORDER 11020896 ASSET 74781 HVAC SYSTEM. BASA2. REGULAR. SHOP 41. *** CONTACT: *STEAM DISTRIBUTION, SHOP 24; PHONE: 217-333-3653; EMAIL:
Reason : repair steam leak on heat exchanger, requires full building outage
If you have any further questions or concerns, please do not hesitate to email the SCS Facilities and Safety team at scs-facilities@mx.uillinois.edu. This information will also be available for viewing on the SCS Building Outages/Important Notices blog: www.scsbuildingoutages.blogspot.com
Safety and Inventory Coordinator– School of Chemical Sciences
94 Roger Adams Lab
217-300-6618
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.